Enmet PID-Guard Manual do Utilizador Página 7

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 26
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 6
PID-G
UARD
ENMET Corporation
5
3.0 Installation
The PID-G
UARD
should be located near the pipe or tank containing the air to be monitored, and upstream from where the air is
being used. The PID-G
UARD
must be installed such that it samples the compressed air before it reaches the users.
3.1 Mounting PID-G
UARD
Mount the PID-G
UARD
instrument on an appropriate vertical surface, leaving room for lid to be opened, using the mounting
holes provided. Avoid areas with excessive vibration or temperature extremes. The holes in the bottom of the enclosure are
0.18 inch in diameter and form a 6.44 x 4.47 rectangle. See Figure 3
It is recommended to use #8 drywall anchors and screws for mounting the PID-G
UARD
to a drywall/sheetrock surface.
Dimensions are in inches.
Figure 3: Mounting PID-G
UARD
Right Side View
Cover Inside View
Opened Upward
Attached to Base
Vista de página 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 25 26

Comentários a estes Manuais

Sem comentários